EV vs Petrol Comparison

    EV vs Petrol Cost: Oshawa Quebec City

    How much cheaper is an electric vehicle compared to petrol on this 816 km route? Prices updated May 21, 2026.

    Distance
    816
    km
    Petrol Car
    CAD 108.05
    Regular · 12 km/L
    Best EV (home)
    CAD 20.28
    home charging

    Cost Comparison

    One-way energy cost for EV models vs petrol vehicles. Home charging at CAD 0.17/kWh, DC fast at CAD 0.62/kWh.

    VehicleEnergy usedHome chargeDC fastSaving vs car
    BYD Atto 3129.5 kWhCAD 22.54CAD 80.30CAD 85.51 saved
    Tesla Model 3116.6 kWhCAD 20.28CAD 72.27CAD 87.77 saved
    Volvo XC40 Recharge194.3 kWhCAD 33.81CAD 120.46CAD 74.25 saved
    MG4120.0 kWhCAD 20.88CAD 74.40CAD 87.17 saved
    BMW iX3151.1 kWhCAD 26.29CAD 93.69CAD 81.76 saved
    Petrol Car (Regular)68.0 LCAD 108.05reference
    Petrol Van (Diesel)90.7 LCAD 151.32reference

    DC Fast Charging Time

    Time to recharge the energy used for this 816 km route at DC fast charge speed.

    BYD Atto 3
    1h 37m
    129.5 kWh at 80 kW max
    Tesla Model 3
    41 min
    116.6 kWh at 170 kW max
    Volvo XC40 Recharge
    1h 18m
    194.3 kWh at 150 kW max
    MG4
    1h 2m
    120.0 kWh at 117 kW max
    BMW iX3
    1h 0m
    151.1 kWh at 150 kW max

    Canada EV Electricity Rates

    Rates used in the calculations above.

    Home charging
    CAD 0.17
    per kWh
    Home charging assumption
    DC fast charge
    CAD 0.62
    per kWh
    Public DC fast charging assumption

    EV Questions: Oshawa to Quebec City

    Is an EV cheaper than petrol for Oshawa to Quebec City?

    Yes, on home charging, the best EV option for this 816 km route costs approximately CAD 20.28, compared to CAD 108.05 for a petrol car on Regular. That's a saving of CAD 87.77 per one-way trip. DC fast charging is slightly more expensive but still competitive.

    How long does it take to recharge an EV for this route?

    It depends on the EV and charger type. On a DC fast charger, most EVs listed here can replenish the energy used for this route in 10–40 minutes. Home AC charging typically takes several hours for the equivalent energy. See the charging time breakdown in the table above.

    What is the electricity rate for EV charging in Canada?

    The home charging rate used here is CAD 0.17/kWh. Public DC fast charging is estimated at CAD 0.62/kWh. Rates may vary by charger operator and subscription plan.

    Which EV is most efficient for highway driving in Canada?

    Among the reference models listed here, the Tesla Model 3 achieves approximately 7.0 km/kWh on highway routes, making it one of the most efficient for long-distance travel. Real-world performance may vary with speed, air conditioning, and load.

    Product demos

    See Lynxo in action

    View all →

    For Fleet Operators

    Managing a fleet? Track fuel costs across all your routes.

    Lynxo helps logistics companies and delivery operations plan routes, track drivers, and monitor per-trip costs, so every route cost is accounted for.

    Also explore: Courier management · Last-mile delivery · Delivery management · GPS tracking