Malaysia Road Fuel Cost Estimator

    Putrajaya Batu Caves

    How much petrol or diesel does it cost to drive from Putrajaya to Batu Caves? Breakdown by vehicle type using today's Malaysia fuel prices, updated from the datasource.

    Distance
    46
    kilometres
    Drive Time
    0h 51m
    highway est.
    Toll
    RM 2.50
    one-way est.
    Lynxo

    Go beyond fuel estimates. Run your whole fleet.

    Fuel & Route Planning

    Live driver tracking
    Fuel cost per trip
    Route optimisation
    Proof of delivery
    Try Free →

    No credit card required

    Fuel Cost by Vehicle Type

    Select your vehicle to see the detailed fuel breakdown for this route. Prices as of 7 May 2026.

    Motorcycle
    Kapchai / Underbone
    Avg mileage
    40 km/L
    Fuel needed
    1.1 L
    RON 95
    One-way fuel cost
    RM 4.62
    excl. toll
    One-way fuel + tollRM 7.12
    Round trip fuelRM 9.25
    Round trip fuel + tollRM 14.25
    By fuel type (one-way)
    RON 95: RM 4.62
    RON 97: RM 5.63
    Suitable for solo dispatch or last-mile
    Car / SUV
    Sedan, MPV, SUV
    Avg mileage
    12 km/L
    Fuel needed
    3.8 L
    RON 95
    One-way fuel cost
    RM 15.41
    excl. toll
    One-way fuel + tollRM 17.91
    Round trip fuelRM 30.82
    Round trip fuel + tollRM 35.82
    By fuel type (one-way)
    RON 95: RM 15.41
    RON 97: RM 18.78
    Courier, sales, and small parcel delivery
    Van / MPV
    Cargo van, 1-ton van
    Avg mileage
    9 km/L
    Fuel needed
    5.1 L
    Diesel
    One-way fuel cost
    RM 26.42
    excl. toll
    One-way fuel + tollRM 28.92
    Round trip fuelRM 52.85
    Round trip fuel + tollRM 57.85
    By fuel type (one-way)
    RON 95: RM 20.55
    Diesel: RM 26.42
    Mid-volume delivery and food distribution
    Lorry
    3-ton, 5-ton, 10-ton
    Avg mileage
    5 km/L
    Fuel needed
    9.2 L
    Diesel
    One-way fuel cost
    RM 47.56
    excl. toll
    One-way fuel + tollRM 50.06
    Round trip fuelRM 95.13
    Round trip fuel + tollRM 100.13
    Bulk freight, FMCG, and logistics hauls

    Monthly Fleet Fuel Cost

    Running this route regularly? Estimated one-way fuel cost per month, by trip frequency. Figures use primary fuel for each vehicle type (toll excluded).

    Vehicle1×/month5×/month10×/month22×/month
    Motorcycle
    RON 95
    RM 5RM 23RM 46RM 102
    Car / SUV
    RON 95
    RM 15RM 77RM 154RM 339
    Van / MPV
    Diesel
    RM 26RM 132RM 264RM 581
    Lorry
    Diesel
    RM 48RM 238RM 476RM 1,046

    Add RM 2.50 toll per one-way trip to get total trip cost per journey.

    Full Fuel Cost Comparison

    All vehicle types × all fuel types for this route.

    Vehiclekm/LRON 95RON 97DieselFuel + Toll
    Motorcycle40RM 4.62RM 5.63RM 7.12
    Car / SUV12RM 15.41RM 18.78RM 17.91
    Van / MPV9RM 20.55RM 26.42RM 28.92
    Lorry5RM 47.56RM 50.06

    "Fuel + Toll" uses the primary fuel type for each vehicle. Toll is one-way estimate.

    Today's Fuel Prices in Malaysia

    official Malaysia fuel price announcements used in all calculations above

    Standard petrol
    RM 4.02
    RON 95
    Cars, motorcycles, vans
    Premium petrol
    RM 4.90
    RON 97
    Performance vehicles
    Euro 5 diesel
    RM 5.17
    Diesel
    Lorries, vans, 4x4s

    Last updated: 7 May 2026. Prices are sourced from official Malaysia fuel price announcements.

    Customise Your Cost Estimate

    Adjust mileage, fuel type, and trip frequency to match your actual vehicle and schedule.

    12 km/L
    4 km/L (lorry)50 km/L (motorcycle)
    22×
    1
    1 driver50 drivers

    Your estimate

    One-way cost (RON 95 + toll)
    RM 17.91
    22 trips/month
    RM 394
    total monthly fuel cost

    Product demos

    See Lynxo in action

    View all →

    Common Questions: Putrajaya to Batu Caves

    How far is Putrajaya to Batu Caves?

    The highway distance from Putrajaya to Batu Caves is approximately 46 km. The estimated driving time is 0h 51m under normal highway conditions.

    How much petrol does a car use from Putrajaya to Batu Caves?

    A typical car with 12 km/L mileage uses approximately 3.8 litres of petrol. At today's RON 95 price (RM 4.02/L), that costs RM 15.41.

    How much does a lorry spend on diesel from Putrajaya to Batu Caves?

    A lorry averaging 5 km/L needs about 9.2 litres of diesel for this route. At RM 5.17/L, the fuel cost is RM 47.56 one-way.

    What is the toll charge from Putrajaya to Batu Caves?

    The estimated one-way toll on this highway route is approximately RM 2.50. Toll estimates are calculated from PLUS highway rates. Actual charges vary by specific highway and entry/exit points.

    How much does a motorcycle spend on fuel from Putrajaya to Batu Caves?

    A motorcycle averaging 40 km/L uses about 1.1 litres. At today's RON 95 price, that's RM 4.62, making it the most fuel-efficient option for this route.

    What is the total cost (fuel + toll) for a delivery van on this route?

    A delivery van using diesel at 9 km/L needs 5.1 litres, costing RM 26.42 in fuel. Add the RM 2.50 toll for a total one-way cost of approximately RM 28.92.

    For Fleet Operators

    Managing a fleet? Track fuel costs across all your routes.

    Lynxo helps logistics companies and delivery operations plan routes, track drivers, and monitor per-trip costs, so every route cost is accounted for.

    Also explore: Courier management · Last-mile delivery · Delivery management · GPS tracking